v2.6
What's New in 2.6: (Fixtures manufactured after 1-1-2024)
- The PIN diagram guide is no longer needed. All panels are now pre-marked.
- If the wall/panel will be used for a Snack or Kiosk, place a pin/stub in each hole that has a | or a + next to it
- If the wall/panel will be used for a Surround, place a pin/stub in each hole that has a - or + next to it
- Shelf Installation and Merchandising, Pegs, and Lighting are now in VOL 4
- General corrections
What's New in 2.4: (4-22-2021)
- Added additional images detailing new markings on the panels to assist with identification and assembly
- General corrections
What's New in 2.3: (2-8-2021)
- Clarifications on the Assembly of Cooler Spreaders
- Updated Graphic (exploded) View of Fixtures
- Updated STUB diagram for Snack
- Added Kiosk Assembly
- Ambient (Snack) Merchandiser Assembly Video - Added
What's New in 2.21: (1-25-2021)
- 3D Letter-Mount groove added to all headers, all finishes with mfg date of 1/1/2021.
Ambient (Snack) Merchandiser